Before & After: How One Conveyor System Transformed a Warehouse Dispatch Operation — ROI in 11 Month

This is a real story about a real plant. We are sharing it because the numbers speak better than any brochure. ━━━━━━━━━━━━━━━━━━ THE SITUATION — BEFORE ━━━━━━━━━━━━━━━━━━ Client: Consumer goods distribution company Location: Ecotech-III, Greater Noida, Uttar Pradesh Operation: 6, 000–8, 000 cartons per day dispatched from warehouse ground floor to loading bay at dock level (+1.2 metres) The problem: ❌ 7 workers manually carrying cartons to dock — each trip 35 metres ❌ Average handling rate: 380 cartons per worker per shift ❌ Physical fatigue causing 3–4 workers per shift to underperform after lunch ❌ 3 workplace injuries in 12 months — two requiring medical leave ❌ Peak season temporary worker costs: ₹1.4 lakhs per month above base ❌ Dispatch completion frequently missed evening truck cut-off by 15–25 minutes ━━━━━━━━━━━━━━━━━━ THE NEO CONVEYORS SOLUTION ━━━━━━━━━━━━━━━━━━ After a half-day site survey and layout study, our engineering team proposed a 3-section integrated system: Section 1 — Ground floor accumulation: • 20m × 600mm powered roller conveyor from pick & pack stations to incline feed point • Variable speed (0.4–1.0 m/s) to match pick rate Section 2 — Inclined transport: • 6m inclined cleated belt conveyor rising 1.2m to dock level • 18° incline, 600mm width, anti-slip cleated PVC belt • Load capacity: 800 kg distributed Section 3 — Dock-level distribution: • 14m × 600mm powered roller line across dock face with 4 zone stops • Manual divert gates at each truck bay position Total: 40m of integrated conveyor — designed in 2 days, commissioned in 16 working days. ━━━━━━━━━━━━━━━━━━ THE RESULTS — AFTER ━━━━━━━━━━━━━━━━━━ ✅ Manual dispatch workforce reduced from 7 to 2 (supervisor + dock-end operator) ✅ Throughput increased from 6, 000 to 9, 900 cartons/day — a 65% increase ✅ Physical strain injuries: zero in 20 months since commissioning ✅ Dispatch completion: evening truck cut-off met on 100% of working days since installation ✅ Peak season temporary worker requirement: eliminated entirely ✅ Monthly labour saving: ₹1.58 lakhs ✅ Full project ROI achieved: 11 months ━━━━━━━━━━━━━━━━━━ THE NUMBERS SUMMARY ━━━━━━━━━━━━━━━━━━ Project cost: ₹17.4 lakhs Monthly saving: ₹1.58 lakhs (labour) + ₹0.3 lakhs (temp workers) Annual saving: ₹22.56 lakhs ROI timeline: 11 months 5-year net saving: ₹95 lakhs+ (against ₹17.4 lakh investment) ━━━━━━━━━━━━━━━━━━ Thinking about a conveyor investment but unsure of the ROI? Share your current operation details — our engineers will model the numbers for your specific case. Free. No obligation. 🌐 www.neoconveyors.com conveyor ROI case study India warehouse conveyor before after Greater Noida material handling automation ROI Ghaziabad dispatch conveyor transformation Delhi NCR conveyor investment payback period UP India
 2026-07-27T08:11:25

Keywords