A belt has no capacity in cartons until you decide how far apart they sit. The sum is short:

Cartons per hour = belt speed (m/min) x 60 ÷ pitch (m)
Pitch = carton length along the belt + the gap between cartons

An example. A 400 mm carton fed by hand with a 300 to 400 mm gap has a pitch of 700 to 800 mm.

At 20 m/min, the top speed on our carton belts: 1, 500 to 1, 714 cartons an hour.
At 4 m/min, the slowest our VFD takes it to (20% of top speed): 300 to 343 cartons an hour.
On a cleated belt the cleat spacing sets the pitch, and the carton sits between two cleats. Cleats 600 mm apart at 20 m/min carry 2, 000 an hour, one carton to a space.

Three things to remember. This is the most the belt can carry, not what your people will feed by hand. Size it for your peak hour, not the average. And if the belt is wide enough, turn the carton so its short side leads. The pitch drops and the number goes up.

Send us your carton size, the rate you need and how it is fed, and we will tell you the belt speed and width.

conveyor capacity calculation
belt conveyor capacity cartons per hour
how to calculate conveyor throughput
conveyor belt speed calculation
carton conveyor speed, belt conveyor VFD speed
conveyor design calculation India
Nov 13th, 2026 1:38 PM

Keywords